Monday, 15 October 2012

PRESENTATION WEEK


This is the project presentation week, for FYP sem 1. All FYP sem 1 students will be at Gemilang Hall starting 2 pm until 5 pm. Each student have two assessors to evaluate their project presentation. For my presentation, I was evaluated by two assessors, first Sir Syamsul Adlan and second Madam Zaridah. I will present the best as I can do without any problems and thanks a lot to our assessors by making our presentation goes smooth and easy.

Tuesday, 9 October 2012

PRESENTATION PREPARATION


In week 12, all FYP sem 1 students will have their project presentation at Gemilang Hall. The purpose of this presentation was to tell the assessor/evaluator about the project ideas and the objective of producing the project. As a preparation for the presentation, I need to make the presentation slides. The slides must contain the introduction of the project, problem statement, objective, project limits, the work plan and also the methodology. I made the slides and discuss with my supervisor/adviser about it. There were some correction and addition needed to be made before the presentation slides ready to be presented in front of the evaluator.

Sunday, 7 October 2012

PROGRESS 8 : BUDGET

BUDGET



Total all costing is RM250.00. All the costing and budget above are the estimation only and all the item and components are not finalize at all because there is only estimation and maybe involve with other component and other circuit or any upgrading to the project.